4.1 Enclosure

Preparation

Remove the protective covering from the system.

The doors may be opened with a socket pin-head key, Argus #647-060-10.

(images not to scale)

Figure 4–Illustration of door latch and socket pin-head key for Te17 panels

The door panels are designed to be locked with a pad-lock and are secured for shipping using tie-wraps.
Cut these away and open all doors. Inspect the packing slip to verify that all equipment is there.

All documentation is in a plastic bag and located inside the equipment compartment.

If batteries are on a separate pallet, they should not be installed until after the enclosure has been secured.
If the batteries are going to be placed within the enclosure, the inter-unit connectors must be installed.

Inspect moving parts, hardware, connectors, and installed equipment. In case of damage, report it ac-
cording to procedure.
Remove and properly dispose of all packaging.

Remove the 4 bolts securing the enclosure riser to the pallet. They are accessible from inside the riser bot-
tom corners:

Figure 5–Bottom views of Te17 riser (pallet bolts)

Typical left side, 2PL

Typical right side, 2PL

030-729-C0 R

EV

A

P

AGE

5

OF

14