Test and commissioning (overview), System, Battery – Alpha Technologies Te17 User Manual

Page 26: Documentation, Est and, Ommissioning, Verview, 1 system, 2 battery, 3 documentation

Advertising
background image

T

E

17 O

UTDOOR

E

NCLOSURE

A

RGUS

T

ECHNOLOGIES

I

NSTALLATION

7 T

EST AND

C

OMMISSIONING

(O

VERVIEW

)

7.1 System

All Argus power system components undergo thorough factory testing. All levels/alarms are set to
predetermined values as detailed in their individual component manuals except where custom levels are
specified. Good installation practice is to check the operation of all features and alarms and to set the
power system levels in accordance with the specific requirements of your system.

The individual system component manuals detail the methodology for testing and
calibration of all components.

7.2 Battery

After installation of batteries it is usually necessary to “initial charge” the batteries to ensure proper
operation and to eliminate plate sulfation. Follow guidelines supplied with the battery and record initial
charge readings; i.e. specific gravity, cell voltage, charge current and temperature.

Battery warranty may be void if batteries are not initially charged following the
manufacture's guidelines – with proper records maintained.

Some VRLA batteries do not require initial charging if placed on charge within 3-6 months of
manufacture, check with the manufacturer.

After the equalization period battery voltage should be reduced to the recommended float level.

Once the batteries have been initial charged it is suggested to perform a short duration high rate discharge
test on the batteries to verify the connections on the batteries and also to verify that there are no open or
failed cells. Cell voltages should be monitored during this process.

• Discharge for 15 minutes at the C/8 rate.

• Record cell voltages every 5 minutes.

• Check for overheating connections.

7.3 Documentation

Complete all necessary documentation; i.e. battery reports (Table A), DC wiring lists, AC distribution
tables, floor plans, etc. Tag wires, fill out identification strips, and identify circuit breakers.