Carlon Structured Cable Management Systems Handbook - Low Res User Manual
Page 28

26
From the First Floor
Run the Resi-Gard from the low voltage outlet location,
down vertically through the sill plate and into the
basement. Then in the basement, run it horizontally to
the distribution panel.
From the Second Floor
Install the Resi-Gard from the outlet, through the sill
plate and header and vertically down through the first
floor wall cavity. Then from the first floor, run it
through the first floor sill plate and into the basement.
Then in the basement, run the Resi-Gard horizontally to
the distribution panel.
Slab Applications
Resi-Gard can also be concrete encased for slab
applications.
MAIN CHASE
When you run a Resi-Gard Flexible Raceway chase,
it’s run from the basement or equipment closet to the
attic through common interior walls or up through an
exterior wall.
Gross Automation (877) 268-3700 · www.carlonsales.com · [email protected]