J&M 1326-22T User Manual

Page 30

Advertising
background image

28

SET-UP INSTRUCTIONS (Continued)

Roll Tarps for Grain Carts

8

Installing the Tarp Stand-Offs

Install each tarp standoff at each end of the

grain cart wall on the off auger side with two

1/4” x 1 1/2 self tapping bolts. Place it about

2” down from the drip edge along side of the

corner brace.

Tarp Stand-Offs

Riveting the Canvas Tarp to the Square Tubing

Stiffening Patch

Insert the 1”x1” 14ga x 192” long square tube into

the sleeve on the Canvas Tarp that is on the oppo-

site side of the Stiffening Patch. Center the can-

vas tarp on the 1” x 1” 14ga x 192” long square

tubing. There should be aproximately 2” (5cm) of

tubing sticking out each end of the tarp. Use a

1/4” drill bit to drill through the canvas tarp and

one wall of the 1” x 1” 14ga x 192” long square

tubing. (See STEP-8.1) Repeat and drill a hole at

the same location on the opposite end of the tub-

ing. Use a hammer to install both 1/4” (6.35mm)

drive rivets.

7

Center the 1” square tube that is riveted to the

canvas tarp on the auger side of the cart. Use

a 3/8” drill bit to drill three holes through the

square tubing and auger side wall of the cart.

The holes should be approximately 2 1/2”

down from the top of the sideboard. Two

holes should be placed 14” from the ends of

the square tubing and the third hole should be

centered on the square tubing. Install the three

stop brackets with three 3/8”-16 x 2” hex bolts

and three 3/8”-16 centerlock hex nuts.

9

Mounting Canvas Tarp to Cart

Stop Brackets

2”

3/4”

Canvas Tarp

Square Tubing

1/4” Rivet

2 1/2”

14”

Advertising
This manual is related to the following products: