Installation Instructions

KWT-110

15

Vertical Installation using Steel Studs

After determining the site meets the installation requirements
(see Site Requirements for Using Steel Studs section):

1.

Identify desired mounting location on wall.

2.

Using a stud finder or similar method locate stud.

3.

Align the middle mounting holes on mount with stud making
sure mounting holes are centered on stud. (See Figure 24)

4.

Using wall track accessory (A) as a template, mark location
of three mounting holes on wall. (See Figure 24)

Figure 24

5.

Drill three 1/2" holes in locations marked in Step 4.

6.

Hold metal channel on anchor (K) flat alongside plastic
straps and slide channel through hole. (See Figure 25)

Figure 25

7.

Holding plastic straps on anchor (K), pull anchor away from
wall until channel rests flush behind wall making sure
anchor channel is positioned vertically on stud. (See Figure
26)

8.

Slide plastic cap on anchor (K) towards wall until flange of
cap is flush with wall. (See Figure 26)

Figure 26

9.

Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 27)

10. Repeat steps 6 through 9 for each mounting hole.

Figure 27

11. Place wall track accessory (A) over anchors and align

mounting holes in display mount with holes in anchors. (See
Figure 27)

12. Insert 1/4-20 x 1 3/4" Phillips pan head screws (X) through

corresponding mounting hole on wall track accessory and
into anchor (K) and tighten until flush against mount. DO
NOT overtighten! (See Figure 28)

13. Repeat steps 11 through 12 for remaining 2 mounting holes.

4

3

X 3

X 3

Mounting holes
centered on stud

(A)

(K) x 3

Drywall

Plastic Straps

6

(K) x 3

Plastic Cap

Drywall

Anchor Metal Channel

SIDE VIEW

8

Steel Stud

Plastic Straps

Drywall

Anchor Metal Channel

Plastic Cap

SIDE VIEW