79

Water/Glycol System

1. Has the entire system been flushed and pressure checked?

Yes No

2. Has the entire system been filled with fluid?

Yes No

3. Has air been bled from the heat exchangers and piping?

Yes No

4. Is the glycol the proper type and concentration (N/A if water)?

Yes No

5. Is there a minimum load of 50% of the design load?

Yes No

6. Has the water piping been insulated?

Yes No

7. What is the freeze point of the glycol (N/A if water)? ______________________________

Gas Heating

Natural Gas

Propane

Purge Air from Lines

Verify Pilot Spark

Stage

Manifold Pressure (w.c.)

Stage

Manifold Pressure (w.c.)

1

3

2

4


Electric Heating

Stages__________

Limit Lockout

Aux. Limit Lockout

Stage

Amps

Stage

Amps

1

3

2

4