Electric Heat Section Procedures

1. Perform final visual inspection.

Check all equipment ductwork and
piping to verify that all work is
complete. Improperly installed
equipment or ductwork can affect
readings.

2. Ensure that there is no construction

debris in the unit.

3. Check the unit for external damage.
4. Note all accessories installed.
5. Install a filter of the proper size and

type.

6. Check all terminal blocks, fuses, fuse

blocks, and contactors for
correctness.

7. Check all high and low voltage

wiring connections for correctness,
and tightness.

8. Check unit for correct incoming

voltage per the data plate.

9. Turn the power on.
10. Turn on the first stage of heating


Check amp draw of each element of each
stage.

Ensure blower started with electric heat.

Check for temperature rise across heating
section while all stages are on.

If temperature rise is within range, turn all
heating calls off.


Check to see that fan stops.

Refrigerant Cooling Section Procedures

1. Perform final visual inspection. Check

all equipment, ductwork and piping to
verify that all work is complete, and
equipment is properly installed and
mounted. Improperly installed
equipment or ductwork can affect
readings.

2. Perform condensing unit start-up checks

in addition to these air handling unit
checks according to the unit
manufacturer’s instructions.

3. Ensure that there is no construction

debris in the unit.

4. Check the unit for external damage.
5. Install filter of the proper size and type.
6. Ensure that drain P-trap is installed.
7. Check all terminal blocks, fuses, fuse

blocks, disconnect box, and contactors
for correctness.

8. Check all high and low voltage wiring

connections for tightness. Check unit for
correct incoming voltage per the data
plate.

9. Check the security of the locking system

on all blower bearings.

10. Turn the power on.
11. Check and record ambient temperature.
12. Check for guaranteed off timers (GOT),

and/or time delay relays (TDR).

13. Start the first step cooling circuit, and

blower circuit.


Optional Equipment Procedures


If Modulating Hot Gas Reheat is equipped,
additional installation steps are required.

1. Field installed piping is required.
2. The field supplied thermostat and
humidistat must be wired to the reheat
control as shown in the unit wiring diagram.



Do not alter factory wiring. Deviation
from the supplied wiring diagram will
void all warranties, and may result in
equipment damage or personal
injury. Contact the factory with wiring
discrepancies.