25

Startup

(See back of the manual for startup form)




















Before the startup of the chiller be sure that
the following items have been checked.

1. Verify that electrical power is available

to the unit.


2. Verify that any remote stop/start device

connected to the chiller controller is
requesting the chiller to start.

3. Verify that liquid flow is present through

the chiller from the building.


4. There should be a building load of at

least 25% of the chiller capacity in order
to properly check operation.

5. With the main power switch off, review

the MCS Controller Manual provided
with the chiller. Understand the keypad
functions, how to set the leaving water
temperature setpoint, and how to initiate
the Run State.

Use the general check list at the top of the
startup form to make a last check that all the
components are in place, water flow is
present, and the power supply is energized.

Using the controller keypad, individually set
the outputs in “Manual On” to confirm relay
closure and compressor operation.














Cycle through all the compressors to
confirm that all are operating within
tolerance.

While performing the check, use the startup
form to record observations of compressor
amps and refrigerant pressures.

When all is running properly, place the
controller in the Run mode and observe the
system until it reaches a steady state of
operation.

Note:

For

more

information

on

programming the controller refer to the
MCS Controller manual provided with the
chiller.







Electric shock hazard. Shut off all
electrical power to the unit to avoid
shock hazard or injury from rotating
parts.

WARNING


Improper

installation,

adjustment,

alteration, service, or maintenance
can

cause

property

damage,

personal injury, or loss of life. Startup
and service must be performed by a
Factory Trained Service Technician

WARNING


Rotation must be checked on all
MOTORS AND COMPRESSORS of
three phase units. All motors, to
include and not be limited to pump
motors and condenser fan motors,
should all be checked by a qualified
service technician at startup and any
wiring alteration should only be made
at the unit power connection.

CAUTION


Before completing installation, a
complete operating cycle should be
observed

to

verify

that

all

components are functioning properly.

CAUTION