Configuring the adt-aps-6r – ADT Security Services ADT-APS-6R User Manual

Page 16

Advertising
background image

2. Installation

Configuring the ADT-APS-6R

16

ADT-APS-6R Instruction PN 50935:B 7/21/00

Configuring the ADT-APS-6R

The ADT-APS-6R may be configured for the following:

• 8-hour delay for reporting loss of AC: cut jumper JP2.

• 16-hour delay for reporting loss of AC: cut jumper JP2 and JP3.

• 240 VAC operation: cut jumper JP1.

The figure below illustrates the location of the jumpers:

Figure 10 Configuring the ADT-APS-6R

JP

1

J2

J9

J3

J1

TB

2

JP

3

JP2

JP3

JP2

JP1

A

P

S

-6R

con

fi

g

.cdr

ADTAPS-6R__INSTENGLB0.fm Page 16 Tuesday, November 21, 2000 11:30 AM

Advertising