Terrace mounting – DE DIETRICH NEO 2.1 User Manual

Page 11

Advertising
background image

4

The installation set is designed for rooves with standard roof

tiles. If the roof in which the panels are to be fitted has particularly

high roof tiles, please consult your specialist advisor.

4.1.3.

Terrace mounting

n Ballast per solar panel (kg)

Rules NV65 (DTU P06-002, April 2000): Calculation rules defining the

effects of snow and wind on buildings.

CAUTION

If the assembly's supporting frame is not screwed to the

building, it must be weighted down according to the

technical guidance. Kerb stones (100 x 250 x 080), for

example, are suitable for weighting down. Stones must be

slid in and set in between the T frames. Position the ballast

stones before the finally attaching the inner screws and

the cross.

At no time should the maximum authorised load be

exceeded. If necessary, a structural engineer should be

consulted before commencing work.

Building height (m)

Ballast per solar panel (kg)
Zone 1 Zone 2 Zone 3 Zone 4 Zone 5

< 10

140

170

210

255

340

10 to 20

170

200

250

300

405

20 to 30

190

230

285

340

455

30 to 40

205

245

310

370

495

Increase coefficient for

exposed sites (shoreline,

hilltops, narrow valleys, etc.)

1.35

1.3

1.25

1.2

1.2

The values indicated in the "Zone 5" column in the table

are valid for the Outre-Mer regions.

n Pull-out resistance of the screws holding the supports

in place

Building height (m) Panel holding resistance in terms of panel slope

(N/m

2

)

60°

45°

< 10

4400

3400

10 to 20

5200

4300

20 to 30

5900

4800

30 to 40

6400

5200

1

2

3

4

M001772-A

NEO 2.1 / SUN 211

4. Installation

05/10/09 - 300020210-001-B

10

Advertising