Assembly, Main menu, X_dt and xhds cutting lengths – FlexLink XL (65 мм) Монтаж системы капельных поддонов User Manual
Page 3: X_dt

Assembly
X_DT and XHDS cutting lengths
How to use the table:
1 Measure the length of conveyor beam X_CB or
X_CB_N, under which you will mount the drip tray.
2 In the table, look up the products that will be
mounted adjacent to the drip tray. Read the value
where the row and the column corresponds.
3 Add the values from the table to the total length of
the conveyor beam, as measured in step 1. If the
value in the table is negative, it should be sub-
tracted from the total length of the conveyor beam.
4 Cut drip trays X_DT and drip catchers XHDS to the
calculated lengths.
Drip tray/
drip catcher
X_DC X_DD X_DE
X_DH X_DJ X_DV-
B*
X_DV-
E**
XSDT
0
+39
+35
-24
-10
+80
+110
XLDT
0
+55
+35
-25
-10
+80
+110
XMDT
0
+59
+35
-25
-10
+80
+110
XHDT
0
+31
+35
-25
-10
+80
+110
XKDT
0
+11
+35
-77
-20
+80
+115
XHDS L×83
XHDS L×53
0
- 20
0
-130
-80
+20
+135
* The wide, inlet, end of a drip pan for vertical bend.
** The narrow, outlet, end of a drip pan for vertical bend.
X_DT
The following instruction applies to drip tray X_DT.
1 Make sure that the drip tray fits underneath the con-
veyor beam.
2 Use T-bolts, locking nuts and washers to attach the
drip tray brackets to the conveyor beam T-slot.
3 Insert the required number of square nuts in the T-
slot of the drip tray.
4 Attach the drip tray to the drip tray brackets. Do not
tighten the screws fully; you still need to be able to
adjust the position of the drip tray.
5 If the drip tray and the drip pans should serve as
protection against personal injury, the drip tray
should be mounted in the upper position on the drip
tray brackets.
6 Tighten all screws.
7 Mount the drip pan that is to be connected to the
drip tray (see next page).
XLCB
500 + 80 + 55 = 635
500
XLDT
+80
XLDV
+55
XLDD
Example:
An XL conveyor beam is 500 mm long.
The XLDT drip tray that is to be placed underneath
the beam will be connected to one XLDV drip pan for
vertical bend, and one XLDD end pan for idler end
unit.
The table for cutting lengths reads +80 for XLDT/
X_DV, and +55 for XLDT/X_DD.
This means that the length of the drip tray should
be 500 + 80 + 55 mm = 635 mm.
See illustration below.
FlexLink
TB 97-08-29
3
Main menu