Fluid Components International FC88 KIT User Manual

Fluid Components International Equipment

Advertising
background image

DOCUMENT NUMBER

08EN000525

SUBJECT

FC88 KIT

CAGE CODE

64818

DATE

10/23/00

SECTION

PAGE

1 of 5

REVISION

A

INTRODUCTION

General

1.

This kit contains the parts necessary to connect the FC88 Control Display to the GF90/GF92,
AF88/AF89, ST95/ST96, or ST98 Instruments.

2.

Connection instructions are given that show how to connect the FC88 To FCI’s Instruments.

Ordering of Parts

Ordering of parts are to be directed as follows:

Fluid Components Intl
1755 La Costa Meadows Drive
San Marcos, California 92069-5187
Attention: Customer Sales
Phone: (800) 854-1993 or (760) 744-6950 or FAX: (760) 736-6250

Publication Requests

Requests for copies of publications should be directed to the address shown in the above paragraph.

Kit Revisions

This kit will be revised as necessary to reflect current information.

AF88/AF89 OPERATION

Plug the cord into the FC88 as shown in Figure 1. Plug the other end of the cord into P1 of the main
circuit board of the AF88 or AF89 as shown in Figure 1. If the FC88 will not be used in conjunction with
the FlexMASSter the adapter circuit board may be discarded. The FC88 is ready for use.

Using FC88 With Multiple Instrument Models

If an FC88 Control Display Unit has been used on a FlexMASSter instrument and it needs to
be used on an AF88 or AF89 instrument the FC88 will need to be reprogrammed. The
following instructions reprogram the FC88:

1. With the FC88 cable disconnected from the AF88/89, simultaneously depress the CTRL, SHIFT, AND

F1 keys.

2. While holding down all three keys depressed in Step 1, plug the FC88 cable into the energized

AF88/89.

3. A message should immediately come up on the screen of the FC88 as shown below.