5 pneumatic connection, Pneumatic connection – Cashco Siemens PS2 I/P User Manual

Page 56

Advertising
background image

Preparing for Operation

56

SIPART PS2 Manual

A5E00074631-01

3.5 Pneumatic Connection

!

WARNING
For reasons of safety, the pneumatic power may only be supplied after

assembly when the positioner is switched to operating level P manual

operation with electrical signal applied (as--delivered state, see figure

4-4, page 76).

.

NOTE
Note the air quality! Oil--free industrial air, solid content < 30 μm, pressure

dew point 20 K below the lowest ambient temperature.

-

Connect a manometer block for supply air and actuating pressure if

necessary.

-

Connection by female thread G 1/4 DIN 45141 or 1/4” NPT:
P

Z

Supply air 1.4 to 7 bar

Y1

actuating pressure 1 for single-- and double--acting

actuators

Y2

actuating pressure 2 for double--acting actuators

E

exhaust air outlet (remove silencer if necessary)

see figure 2-3 and 2-4, page 18.

-

Safety position when the electric power supply fails:
single action:

Y1

deaerated

double action:

Y1

Max. Actuating pressure

(supply air pressure)

Y2

deaerated

-

Connect actuating pressure Y1 or Y2 (only in double--acting

actuators) according to the desired safety position.

-

Connect supply air to P

Z

.

.

NOTE
In order for spring--loaded pneumatic actuators to be able to reliably

exploit the maximum possible actuating path, the supply pressure must

be sufficiently greater than the maximum required final pressure of the

actuator.

Advertising