Installation, Inspection, Unpacking – Hach-Lange HACH 9523 User Manual

Page 9: Installation considerations, Mechanical installation, Install analyzer

Advertising
background image

Installation

W A R N I N G

Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the document.

Inspection

The equipment has been factory tested and checked prior to shipping. We nevertheless recommend
that you perform a visual inspection in order to ensure that it has not been damaged. Any marked
packaging is a potential sign of damage that may not be immediately visible. Keep all packaging in
the event of claims. If any parts or accessories are missing, refer to your distributor or to Hach
Lange.

Unpacking

The equipment should be unpacked carefully. Make sure that no accessories are lost during
unpacking. If any parts or accessories are missing refer to your distributor or to Hach Lange.

Installation considerations

• Place the controller in an accessible location, preferably above eye-level allowing an unrestricted

view of the display and controls

• Vibrations are not excessive
• Choose a site where access to the equipment is easy
• Keep the sample tubing as short as possible to minimize lag time
• Do not place the sensor next to a heat source
• Ensure there is no air intrusion into the sample supply line

Mechanical installation

If the complete analyzer has been purchased follow the instructions in

Install analyzer

on page 7.

If only the controller was purchased, refer to the controller documentation for installation instructions.

Install analyzer

W A R N I N G

Personal injury hazard. The object is heavy. Make sure that the analyzer is securely attached to a wall for a safe
operation.

English 7

Advertising