Installation, Assemble the probe holder – Hach-Lange SENSION+ MM374 User Manual

Page 5

Advertising
background image

Figure 1 Meter components

1 Electrolyte for the probe

6 Power supply

2 Buffer solutions (pH 4.01 and pH

7.00)

7 Probe holder

3 Calibration beakers (with magnetic

bar inside)

8 Rod

4 Standard solution (1413 µS/cm)

9 Probes (included with kits only)

5 Calibration beaker (with magnetic

bar inside)

10 Meter

Installation

Assemble the probe holder

Follow the numbered steps to assemble the probe holder and to connect
the magnetic stirrer.

English 5

Advertising