1 mechanical installation, 1 required tools – Hach-Lange BUHLER 1027, 1029, 2000 Portable Sampler User Manual

Page 12

Advertising
background image

12

Installation

3.1 Mechanical installation

DANGER
Select an appropriate installation location for the instrument.

Plan out the mechanical mount·before positioning poles or drilling holes. Make
sure the mount has a sufficient bearing capacity. The dowels must be selected and
authorized according to the condition of the wall.
The manufacturer shall accept no liability if the instrument is installed incorrectly.

Plan how to lay cables and tubes and their path in advance. Lay the tubes, data
cables and power cables without any bends and so they do not pose a tripping
risk.

Note: For information on installation with optional accessories, refer to the relevant installation
instructions.

3.1.1 Required tools

Figure 5 Required tools (1027)

Figure 6 Required tools (1029 and 2000)

Advertising