TOOLS NEEDED

Screwdriver

Pipe Wrench

Materials Needed

Pipe Thread
Tape
or Sealant

One 6” X 1 1/2” TBE
PVC Nipple

Two Sections
of 1 1/2” Flex Hose (one
provided with filter)

Two
Hose Clamps

Recommended

Corrosion Resistant
Check Valve

10 X 1 1/4” Phillips
Pan Head Screws with
Washers

Option
1 1/2” Male Adapter
(slip x MPT)

or

2” Female Adapter
(slip x FPT)

When installing with hard
PVC pipe, use either a
female adapter on the
outside port threads or
a male adapter on the
inside port threads.

Apply pipe thread tape or
sealant to the threaded end of
both hose adapters.

1.

The Aqua Smarte Plus Docking Station should
always be installed between the filter and pool
(or between heater and pool if applicable).

Above Ground, Base Installation

Screw adapters into each end of the
Aqua Smarte Plus Docking Station.
Hand tighten. Finish tightening by
turning 1 to 2 revolutions with wrench.
DO NOT OVER TIGHTEN.

2.

Attach the filter section of flex hose to one hose adapter
and the return section of flex hose to the other hose
adapter with clamps and tighten with screwdriver. Bi-flow
valve design allows water flow in either direction.

3.

If using a Aqua Smarte Plus MizerMax Pac
installing a corrosion resistant check valve is
recommended.

4.

For better stability, Aqua
Smarte Plus Docking Station
may be mounted on a base
using Phillips pan head screws.
O

i f

d

i b

k

5.

before the heater.

that is installed with Aqua Smarte Plus
must be installed after Aqua Smarte
Plus (never before) on the return line to
the pool.