The FAAC 624 BLD control panel is used to operate the

following models.

Barrier gate operators:

620 115VAC/230VAC

640 115VAC/230VAC

The 624 BLD programming controls the following:

Operating logic: A, S, E, EP, B, C and other logics.

Reversing device behavior: Choose whether a
triggered reversing device during closing

immediately reverses gate movement or stops the

gate and reverses gate movement when no longer

triggered.

Torque or Pressure: Adjustable from 0 to 50.

Pause time between opening and closing:
adjustable from 0 to 4 minutes.

Opening/Closing time: adjustable from 0 to 4
minutes.

Deceleration Time: programmable

The 624 BLD control panel is installed in an enclosure

that is conveniently located inside the barrier cabinet.

Any addition enclosures should be rated for outdoor

use and be water proof.

The 624 BLD control panel requires a single-phase

power supply voltage (115 VAC [±10%] or 230 VAC [+6

or -10%], 50–60 Hz). The power supply should be

protected by a 15 amp dedicated circuit breaker (not

provided).

The installer is responsible for grounding the

operator system, for providing the main power

breaker switch, and for making sure that the entire

gate system meets all applicable electrical codes.

The installer should refer to the installation manual

for a given operator for more information.

N

OTE

: An installation is U.L. compliant only

when you install the FAAC operators according

to the UL325 standards.

T

HE

624 BLD C

ON

TROL

P

AN

E

L

I

NS

T

A

LLA

T

IO

N

I

NSTRUCTIO

N

S

I

NSTALLING

THE

624 BLD C

ONTROL

P

ANEL

Installing the control panel consists of the following

general steps:

Connecting the main power to the control
panel

Connecting the activating device

Connecting the operator to the control panel

Checking the direction of the motor's rotation

Connecting other devices to the control panel

Set operating modes

C

ONNECT

THE

M

AIN

P

OWER

S

UPPLY

(R

EPLACEMENT

P

ANELS

O

NLY

)

WARNING! Turn the main power off before you

make any electrical connections or before

programming.

If the panel is installed in the barrier system than the

main power needs to be wired to the switch that is

explained in the barrier section of this manual.

Wire the main power supply to control panel terminals

in block J9 (Figure 1C). The installer is responsible for

insuring that a separate, grounded circuit protected by a

circuit breaker is between the control panel and the

main power supply. All wiring should conform to

applicable electrical codes, and all wiring and fittings

should be weatherproof and/or suitable for burial.

Connect the ground to the grounding terminal in block

J9 and connect the power wires to the terminals labeled

N (neutral) and L (line).

N

OTE

: For a 230V system, a neutral is not

needed. Connect one 115V line to the L (Line)

and a second 115V line to the N (Neutral).