Quick guide – Custom Electronics AOV Multi Zone User Manual

Page 16

Advertising
background image



Quick guide

• Fix unit on to wall using mounting holes provided.

• Remove cable ties securing zone cards.

• Connect mains via lower power supply and switch on.

• Check all power supplies are active.

• Check all AOV boards have power.(Timers will enable upon initial

turn on).

• Install batteries to relevant power supplies – removes fault

indications on front panel.


• Install call points, smoke testers or relays to terminals J8-J12 (fire

all zones - Link).

• Install call points, smoke testers or relays to terminals

J33,J39,J42,J48,J53 (Fire zones individually - Link)

• Install actuators to ‘Load’ terminals.

Advertising