Getting started – Magnum Venus Plastech UltraMAX MULTI–COLOR GELCOATER MVE-1400-X-1 User Manual
Page 17

UltraMax Multi-Color Gelcoater Manual
Rev. 03/2013 Page | 17
Getting Started:
1. Unpack unit & components
2. Assemble frame work as needed (note drawing 1101-03-01)
NOTE: If UltraMAX Multi-Color Gelcoater unit is configured with a mobile option
kit, please refer to the kit’s installation instructions for set-up.
3. Install the Carriage Assembly to the pump module assembly
4. Install catalyst jug
5. Install gelcoat filter & surge chamber assembly
6. Install air manifold and manifold air hose to powerhead
7. Attach hose fittings to gelcoat pump, catalyst pump and gun air
8. Attach pickup hoses to the inlet of the pump
9. Internal Mix: Place flush tank in holder and attach air hose from manifold.
Connect yellow flush tube from gun to flush tank.
10. Double check all hose fittings and connections are tight
NOTE: If UltraMAX Multi-Color Gelcoater unit is configured with heaters, please
refer to the installation instructions when you reach this stage of set-up.
NOTE: If UltraMAX Multi-Color Gelcoater unit is configured with heater and or a
heater selector switch, please refer to the drawing when you reach this stage of
set-up.
NOTE: If UltraMAX Multi-Color Gelcoater unit is configured with a catalyst alarm,
please refer to the catalyst alarm manual when you reach this stage of set-up.