Start-up procedures, Chapter – Magnum Venus Plastech APS E-FIT-F-CMB-APS-6 User Manual

Page 4

Advertising
background image

Chapter

1

Start-Up Procedures

INSPECTION & MAINTENANCE OF UNIT

1.

Check solvent cup to be sure it is 1/3 full.

2.

Check catalyst and material levels.

3.

Inspect material spray tip and O-ring and replace if necessary.

4.

Inspect catalyst tip assembly and replace O-rings (if applicable).

5.

Inspect tip pin O-rings on front of gun head and replace if nicked or worn.

6.

Assemble catalyst tip and material tip onto gun.

7.

Lubricate threads on retaining ring and assemble onto gun.

8.

Inspect hose assemblies and connections for leaks and wear and tear.

9.

Check roving quantity.

10.

Inspect and replace as necessary:

· Chopper blades

· Anvil sleeve

· Cutter head bearing

· Idler bearing

11.

Inspect and adjust as necessary:

· Cutter head to anvil sleeve tension

· Idler bearing to anvil sleeve tension

· Check chopper position for most efficient disbursement of chop into spray pattern

12.

Oil cutter assembly air motor with MVP oil as necessary (normally 2-3 drops daily depending on
usage).

Advertising