Shut down the instrument, Technical support, On the web – Luminex xPONENT 4.2 for FLEXMAP 3D User Manual

Page 19

Advertising
background image

2. Select the Current Batch or Saved Batches tab.

3. If you want to open a saved batch, highlight the batch and click Open.

Shut Down the Instrument

Run the daily shutdown routine to prevent clogs and crystallization of salt in the sample
probe. Clogs and crystallization of salt in the sample probe may cause problems with
calibration, verification, and data acquisition; they may also cause sample splashing. Shut
down the system properly to ensure system integrity.

1. On the Home page, click Shutdown. The Auto Maint tab opens, with System

Shutdown selected.

2. Fill the labelled area of the off-plate reagent block (RB2) with a 10-20% household

bleach and water solution.

3. Add deionized water to the labelled area of the off-plate reagent block (RA1).

4. Click Run.

Technical Support

On the Web

For more information, visit the Luminex FAQ page at http://www.luminexcorp.com/support/.

You can access the Technical Support website using a user name and password at https://
esupport.luminexcorp.com/OA_HTML/jtflogin.jsp.

15

Advertising