Wiring instructions – ADC ISDN NT11010 User Manual

Page 18

Advertising
background image

10

Wiring instructions

Figure 4 shows the wiring diagram of the 1010 with the ISDN Customer Premise
Equipment (CPE) and the Line Termination (LT). Follow the instructions given
below to set up the 1010:

Figure 4—Wiring diagram

1

Adjust the DIP switches for the desired S/T wiring setup (see Table 4).

2

Connect the DC power plug of the AD62010 to the power connector on the
side of the 1010.

3

Plug the AD62010 into the AC power outlet. The POWER LED will light
and the S/T&U LED will light or flash depending on the line status.

4

Connect one end of the RJ45 cable into the U-interface connector on the
1010. The other end goes into the U-interface wall outlet.

5

Switch on the power to the ISDN terminal equipment. Connect one end of
the RJ45 cable provided, to one of the S/T connectors on the 1010, and
connect the other end to the ISDN TE.

6

If a second ISDN TE will be used, repeat step 5 to connect the second ter-
minal to the second S/T connector.

7

The S/T&U LED may begin to flash for a few seconds. The LED will go
off when the communication paths have linked. When the LED goes off,
the ISDN CPE is ready for communication.

Advertising