Nova-Tech Pulsafeeder 5-Function Degass Valve User Manual

Nova-Tech Equipment

Advertising
background image


5-FUNCTION/DEGAS VALVE

INSTALLATION OPERATION MAINTENANCE INSTRUCTIONS










































INSTALLATION:

1. Tubing Version: Remove the tubing nut from the discharge valve cartridge on the top of the

pump head. Install the supplied Viton O-ring (#L1501200-VTN)* into the groove around the
tubing tip on the valve cartridge. Hand tighten the 5-Function Valve onto the discharge valve
of the pump. Connect the discharge tubing to the “OUTLET” port and the bypass tubing to the
“RETURN” port of the 5-Function Valve.

**PRESOAK TUBE: Prior to assembly soak tube end in 180°F to Boiling Water (approx.
the water temperature from the discharge of an office coffee maker). Soak time should be
a minimum of 30 seconds.


2. NPT Version: Apply plumbers tape or sealant to the threads of the 5-Function Valve. Screw

“INLET” connection into the discharge valve of the pump head. Connect piping to the
“OUTLET” and “RETURN” port connections of the 5-Function Valve.

*If Viton is not compatible with fluid being pumped and alternate Teflon O-Ring is available
(L1501200-TFE). Viton is the preferred sealing material with difficult to seal fluids like Sodium
Hypochlorite and similar

Page 1 of 4

Advertising