Installation, Put new dock leveler into service – Poweramp LHP SERIES HYDRAULIC User Manual
Page 21
 
19
4111-0012 — Aug 2012
April 2013
INSTALLATION
5.
Raise the leveler platform fully by pushing and 
holding the RAISE button . 
NOTE: The platform of a properly operating dock
leveler will automatically stop rising when it 
reaches its full raised height, at which point, 
the lip extends. 
6.
Release the RAISE button to lower the platform. 
As long as there is no truck present at the dock, 
the platform will lower to the full below-dock 
position as the lip folds.
NOTE: If a truck is present, the platform will lower
until the lip rests on the transport vehicle. 
(See Operating Instructions in Operation 
section.)
1.
Disconnect the external lifting device and chains 
from the lifting brackets.
2.
Check that the leveler is flush with the dock floor 
and that the platform lip contacts both lip keepers 
evenly. 
 If an excessive transition exists between the 
dock floor and leveler and/or lip does not contact 
both lip keepers evenly, contact Systems, Inc. 
Technical Services for further instructions. 
3. Install the dock bumpers as required.
4. Turn the main electrical power ON.
Put New Dock Leveler Into Service
7.
When the platform lowers to the full below-dock 
position, wait 5 seconds after the lip has folded 
to allow lip cylinder to fully retract. Push and hold 
the RAISE button until the platform rises just 
enough to clear the lip keepers, then release the 
RAISE button to allow the platform to lower to 
the cross-traffic (stored) position (lip engages lip 
keepers).
8.
Perform steps 5 – 7 at least four times to purge 
any air that may be in the hydraulic system and to 
ensure proper operation.
9.
Raise the platform fully. Hold the platform at this 
position using the RAISE button and move the 
maintenance prop to the service (upright) position. 
Release the RAISE button to allow the platform to 
lower until it is resting on the maintenance prop.
10. With the maintenance prop supporting the
platform, remove the lifting brackets and front 
shipping bar in between lip keepers.
11. Push and hold the RAISE button until the
maintenance prop drops to its stored position. 
Release the RAISE button and allow the platform 
to lower fully.
Always stand clear of platform lip when working in 
front of the dock leveler. Serious personal injury or 
death may result.
Unless the dock leveler is equipped with a tethered 
remote, two people are required to engage the 
maintenance prop: one person to operate the unit, 
the other person to engage the maintenance prop.