Installation – Poweramp CM SERIES MECHANICAL User Manual

Page 16

Advertising
background image

14

4111-0006 — Sept 2010

Sept 2012

INSTALLATION

A— Front of Dock Pit
B— Dock Leveler Frame

C— Side Pit Curb Angle
D— Gap [3/4 in. (19 mm)

Minimum]

E— Pry Locations
F— Rear Hinge Frame

Angle

G— Rear Pit Curb Angle
H— Flare Bevel Weld, Typical

(To Fit Spacing)

8. With rear hinge frame angle (F) tight against rear

pit curb angle (G), perform/check the following:

• Pry between the platform and rear hinge frame

angle at locations (E) to make sure rear edge of
platform is parallel to the rear hinge frame angle
(F).

• Gap (D) must exist equally along both sides of

leveler so weather seal (if equipped) will not bind
during dock leveler operation.

9. If gap (D) cannot be obtained equally at both sides

of leveler, grind or add material at the rear edge of
rear hinge frame angle (F) as needed.

10. Allow the dock leveler to rest fully on the shim

stacks. Make sure the leveler is in the cross-traffic
(stored) position with lip resting on lip keepers.

11. Check that a smooth and level transition exists

between the dock floor and the dock leveler
platform. Add or remove shims as necessary until
a smooth transition is obtained.

12. If leveler cannot be squared and made level

as instructed in steps 8 – 10, contact Poweramp
Technical Services.

G

H

A

B

B

E

C

F

C

6 in.

(152 mm)

3/8 in.

(9.5 mm)

D

D