Installation, Important – Poweramp HED SERIES HYDRAULIC User Manual

Page 13

Advertising
background image

11

Manual No. 4111-0027

Sept. 2009

May 2012

11

INSTALLATION

IMPORTANT

DO NOT connect the dock leveler electrical wiring

and ground connections until all welding has been

completed.

DO NOT ground welding equipment to any hydraulic

or electrical components of the dock leveler. Always

ground welding equipment to the dock leveler frame,

NEVER to the platform.

Failure to follow these instructions may damage the

motor, hoist cylinder, wiring, and/or control panel.

IMPORTANT

DO NOT weld continuously along the full length of

the base plate. This can put unnecessary stress

on the leveler components, causing the leveler to

malfunction and shorten the lifespan of the affected

components.

If the platform is raised using an external lifting device

or the hydraulic system is opened to atmosphere, air

will enter into the hydraulic system.

Whenever this happens, always cycle the leveler

at least 4 times using the leveler’s own hydraulic

power system before allowing the leveler to be put

into service. This is to make sure all air is purged

from the hydraulic cylinders. Failure to do this may

result in serious personal injury or death.

Two people are required to engage the maintenance

prop: one person to operate the lifting device, the

other person to engage the maintenance prop.

Advertising