Installation – Poweramp TPR SERIES User Manual

Page 16

Advertising
background image

14

4111-0035 — Feb 2012

Aug 2012

INSTALLATION

“TPR”

Center Line of

Dock and TPR

55”

48”

Allow adequate space
for seals and shelters

5”

96”

18”

15”

Wire Harness

3/4” Conduit or

Diameter per Local Code

(Supplied by others)

Junction box
mounted on
dock face, not
to extend out

more than 3”
(Supplied by
others)

Dock Seal

Inside light
and control
box

Outside lights

Inside
Caution sign

Place control box where best suited, within

arms reach, at eye level near door opening

Outside
Caution
Sign

Optional imbed

plated (20”x20”)

4” Thick Bumpers

Disconnect

(supplied by others)

Placard

Advertising