Installation – Teledyne 6000A - Photometric analyzer User Manual
Page 15

Photometric Analyzer
Part I: Control Unit
Part I: 2-1
Teledyne Analytical Instruments
Installation
Installation of Model 6000A Analyzers includes:
1. Unpacking, mounting, and interconnecting the Control Unit and
the Analysis Unit
2. Making gas connections to the system
3. Making electrical connections to the system
4. Testing the system.
This chapter covers installation of the Control Unit. (Installation of the
Analysis Unit is covered in Part II of this manual.)
2.1
Unpacking the Control Unit
The analyzer is shipped with all the materials you need to install and
prepare the system for operation. Carefully unpack the Control Unit and
inspect it for damage. Immediately report any damage to the shipping agent.
2.2
Mounting the Control Unit
The Model 6000A Control Unit is for indoor use in a general purpose
area. This Unit is NOT for any type of hazardous environments.
Figure 2-1 is an illustration of a Model 6000A standard Control Unit
front panel and mounting brackets as shown two mounting tabs are at the top
and two at the bottom of the units frame.