Teledyne GC-Pro/TCD - Gas Chromatograph User Manual
Page 49

GC-Pro TCD
Operation
Teledyne
Analytical
Instruments
35
2. Check to see that the electrical installation conforms to the
instructions contained in the installation section (Chapter 3) and
on the input-output diagram.
3. Remove the top cover and check to see that the printed circuit
boards and cables are firmly seated in their respective sockets.
4. Confirm that recorder and alarm connections are properly made.
4.3 Powering Up the Unit
Before applying power to the analyzer for the first time perform the
following checks:
1. Make sure that the proper power 120/220 VAC 50/60 Hz is
available.
2. Connect the AC power cord to the rear panel and then plug the
other end into the mains supply. As soon as power is established,
the unit will turn on.
3. Check that the Power, CPU, and COM LEDs illuminate and the
Teledyne Logo screen appears on the display.
4. Momentarily, the Teledyne screen will be replaced with a second
start-up screen that lists the Model, Serial Number, Software
Version and other parameters specific to your instrument.