Chromaflux_p03, I. roller-type instructions – Elite Screens ChromaFlux (Standard) User Manual

Page 5

Advertising
background image

www.elitescreens.com/chromaflux

- 3 -

I. Roller-type Instructions

(continued)

N. Immerse the roller into the paint. Using either a filter or tray, roll the brush back and forth in

an attempt to get the paint as evenly spread on the cover as possible.

O. Brush the first coat horizontally from left to right. Wait about 5-10 minutes before applying

the second coat vertically from top to bottom. Use uniform pressure and speed while

rolling the paint.

P. After 30 minutes, remove the painters tape.

(In order to avoid the deterioration of the painters tape, do not wait longer than 8 hours

to

remove.)

Q. Paint will take 12 hours to dry completely; however, the solvents will take 3-5 days to set in

a ventilated environment.

R. After completion, discard any newspaper, film or cardboard used to shield furniture, walls,

or

appliances.

Advertising