A.O. Smith 500 User Manual

Page 9

Advertising
background image

9

CCB - Three position Dipswitch (Flame Control Section):

This dipswitch is similar to the FCB dipswitches described below, but with only three switches being used: the number of blower
speeds (switch #3), Hi Gas option (switch #2) and a spare (switch #1). Only the blower speed selection and Hi Gas are required
because FCB1 always has a blower, igniter, flame checking, and the address is always stage 1.

FCB - Eight position Dipswitch:
Switch 1: Spare:
Switch 2: Hi Gas:

On = Yes

Off = No

Switch 3: Number of Blower Speeds:

On = 1 speed,

Off = 2 speed

Switch 4: Igniter used:

On = Yes,

Off = No

Switch 5*: Blower used:

On = Yes,

Off = No

Switch 6: Flame Checked:

On = Yes,

Off = No

Switch 7 & 8. Stage selection:

7

8

Stage #

Off

Off

Not allowed

On

Off

2

*When switch 5 is in off (no blower) position, switch 3 (blower speeds) is ignored.

Example of Dip Switch configuration:
No High Gas, 1 blower speed, no igniter, no blower,
flame not checked, Stage 2.

CCB/FCB Dip Switches:

Dipswitch configurations are READ ONLY ON POWER UP. These switches are only to be set at the factory or by authorized trained
personnel only! Once set at installation they generally remain that way for the duration of the life of the product. If a switch is
changed, power must be cycled before the change will take effect. The status of all dipswitches can be observed on the system
status screen on the UIM.CCB - Ten Position Dipswitch (Central Control Section):

Water Heaters

Boilers

Switch 1: Selection of the type of boiler application:

On = GB/LB

Off = GW/LW

Switch 2: Trials for ignition:

On = 3

Off = 1

Switch 3: IRI Gas Valve Option:

On = IRI

Off = No IRI

Switch 4: Controlling Probe:

On = Tank

Off = Inlet

Switch 5: Powered Vent:

On = Yes

Off = No

Switch 6: Low Water Cut Off:

On = Yes

Off = No

Switch 7: Low Gas

On = Yes

Off = No

Switch 8: Spare:
Switch 9 & 10. Number stages (FCB's):

9

10

#stages

Off

On = 2

NOTE: If the unit power up with the number of stages selected by dip switches exceeding the number of FCBs, the CCB will detect
this condition and go into a hard lockout. After changing the dip switches to the correct number of stages, the power must be cycled
off and on to accept the change.

Example of Dip Switch configuration:
GW model, 1 ignition trial, No IRI, Inlet control, No Power Vent, No LWCO,
No Low Gas, 2 stage.

Advertising
This manual is related to the following products: