Direct Lift Drop Tail Motorcycle Lift User Manual

Page 2

Advertising
background image

2

Inspection upon receipt of the lift

1. Always inspect the lift for freight damage and make note of any damage on the bill of lading.

2. In case of freight damage, call the truck line immediately and report the damage as a freight claim.

Final Set-Up

This lift is more than 90% factory pre-assembled. The following steps will guide you through the final

set-up. The packaged lift weighs approximately 700 lbs. While disassembling the sub components

will weigh less than that, two or more people will be needed to unload and move the lift around during

initial installation/unpacking of the lift.

1. Unpack the lift from the shipping skid. With the lift table up side down, connect the air hose to the

air cylinder.

2. After tightening the hose to the cylinder, flip the lift over with the table surface up.

3. Connect the other end of the air hose to the foot-operated valve. Put a small amount of air tool oil

in the inlet side of the valve. Then connect the foot-operated valve to 100 PSI air supply.

DO NOT

USE AIR SUPPLY WITH PRESSURE MORE THAN 100 PSI.

4. Release the safety bar by pushing the handle down. Operate the foot valve by stepping on the

footpad forward to raise the lift. The safety bar should engage the ladder automatically while lift is

rising.

5. Step on the footpad again to set the pad in middle position to stop the lift when it reaches

the desired height. ALWAYS LOWER LIFT IN THE NEAREST LOCKED POSITION BEFORE

BEGINNING WORK. NEVER USE THE LIFT UNLESS YOU ARE IN A LOCKED POSITION.

6. Lubricating the joints again before use will ensure a better performance of the lift. While the lift is

fully raised, lubricate the top of the cylinder with oil.

7. Vice Installation, see Fig. 1:

a. Install the vise clamp using (4) M8 x 20 bolts, lockwashers, and nuts.

b. Install the moveable vise arm into the vise clamp.

c. Install the fixed vise arm using (6) M8 x 20 bolts, lockwashers, and nuts.

8. Install wheel stop as shown, Fig. 1 using M8 x 20 bolts, lockwashers, and nuts.

9. Install tie down eyebolts as shown in Fig. 1 using M10 eyebolts, washers, and nuts.

10. Install the drop tail portion of the lift. Use 2 supplied detent pins to lock into place.

11. Install the approach ramp by dropping it into the holes punched on the rear edge of the table.

XLT Installation

(THIS KIT IS OPTIONAL)

1. Run the Extension panel tubes through the holes on the side of the table. Install the side

extensions onto the protruding tubes, Fig. 2. Use locking pins to secure the tubes, Fig. 3.

2. Drop the ramps for the side extensions in place as shown, Fig. 3. Attach using M6 x 16 bolts,

lockwashers, and nuts, Fig. 3.

Advertising