Section 3: Scale Installation

11/08

20

51206 Rev. 1

3.2.5. Wiring the Junction Box

Load Cells are preinstalled, plumbed, and pre-wired to the Junction Box at the
factory, prior to shipping.

─ Dip Switches are not set.
─ Interconnecting cables are not installed.

1. Open the platform access cover, then the junction box cover.

2. Loosen all gland bushing nuts.

3. Wire the Indicator to Junction Box according to the chart below.

4. Follow the indicator installation manual to properly connect it with the platform.

5. Tighten all gland bushing nuts.

IMPORTANT NOTE:

Leave the Junction Box Cover off until all corner

adjustments are completed.