Fairbanks Aegis Heavy Capacity PLF-6200-HQ Series User Manual

Page 11

Advertising
background image

• Make sure the conduit for the scale cable is in place and secured into the

frame opening

• Pour the concrete around and under the frame ensuring a smooth and level

finish

• If a drain is required, form the pit (using the drawing in Appendix III) to place a

slope in the pit floor to the drain.

• Cure to a minimum of 2000 psi before cutting wire.
• Pull the cable through the conduit before placing the scale platform in the

frame

• Level the platform before installing the instrumentation

50637 / SJ4799

11

08/02 Issue 2

2 x 4

Wire

Frame
Assy

Drain

477a

Pit

Advertising
This manual is related to the following products: