Finish Thompson BE-15/15C User Manual

Page 9

Advertising
background image

9


Storing the BE unit:

 PREPARE THE COOLING SYSTEM - Drain and clean the Pump Reservoir per the instructions in the

“Maintenance Schedule” section of this manual. Re-fill the Pump Reservoir with a 50/50 mix of water
and new antifreeze or recycled antifreeze that contains reinhibitor. This will help to protect the
radiator and piping from corrosion (the antifreeze will be circulated through the cooling system during the
next step). Replace the cover to the Pump Reservoir.


 CLEAN THE PROCESS TANK - Drain all residues. Perform a “detergent flush” of the Process Tank per

the instructions in the “Maintenance Schedule” section of this manual.


 DISCONNECT POWER - Turn off the electrical power (at the main circuit breaker) for the BE unit. If

other equipment is connected to the same circuit, disconnect the wiring to the BE unit.


Before restarting after storage:


 RECONNECT POWER - Return the electrical power supply to the BE unit.

 HEAT EXCHANGER - Clean the finned-tube surfaces of the heat-exchangers by blowing compressed air

through the fins from the inside to the outside.


 PREPARE THE COOLING SYSTEM - Drain the antifreeze from the Pump Reservoir. Refill the

reservoir with Pump Primer, Recycled Glycol, or clear water until the reservoir overflows out of the
Recycled Glycol hose. The antifreeze is removed so that the newly Recycled Glycol does not become too
rich in inhibitors once the reinhibitor package is added. Replace the cover to the Pump Reservoir.