3.0 Pre-operational Procedures
3.2.1 Chain
3.2.1
The quantity and location of the chain components including Cushion Rubbers, Washers and Stopper
Assemblies is shown in
Table 3-2
, and
Figure 3-2
. Ensure that all chain components are in the correct
location and properly installed. Never operate the hoist with incorrect, missing or damaged chain
components.
Table 3-2
Chain Stopper Placement
Capacity Code
Load Side
No Load Side
S & DS
Adjacent to bottom yoke
Last link
Figure 3-2
Chain Component Arrangement for the ED1050