3 adjust the load limiter – Harrington Hoists and Cranes (N)ER Load Limiter - ((N)ER1) User Manual

Page 15

Advertising
background image

14

4.2.3

After Load Limiter installation:

If the LL is to be adjusted after installation on to the hoist, then determine the SSL using f and the hoist’s RC
from Table 4-1.

Table 4-1

Rated Capacity

Hoist

Capacity Code*

Load Limiter Type

LL

(lbs.)

Hoist

(Tons)

f

001H

01H

99

1/8

1.55

003S

03S

198

1/4

1.45

005L

05S

397

1/4

1.30

003H

03H

198

1/4

1.65

005S

05S

397

1/2

1.30

010L

010M

010S

10S

794

1

1.30

015S

15 M

972

1.5

1.15

020L

020M

020S

20S

1296

2

1.30

025S

25M

1620

2.5

1.25

030C

30R

3307

1.10

030L

030S

30S

1944

3

1.10

050L

50R

5512

5

1.10

*Refer to ER/NER and SNER Owner’s Manual.

4.3

Adjust the Load Limiter

4.3.1

Refer to Figure 4-1.

4.3.2

Remove the LL’s case cover.

4.3.3

Loosen the setscrew with a hex wrench and Rotate the adjuster clockwise to obtain a sufficient gap
between the adjuster and the elec trical switch plunger.

4.3.4

Apply the Static Set Load determined in section 4.2 above.

4.3.5

Rotate the adjuster counter clockwise until the electrical switch is activated or clicks to make contact. A
circuit tester may be used to verify the making of contact.

4.3.6

Tighten the setscrew to lock the adjuster to the plunger arm.

4.3.7

Test the LL setting. Place a test load equivalent to the Set Point Load (RC X SP) on the floor directly
beneath the hoist. Connect the load to the hoist’s bottom hook such that there is no slackness in the hoist’s
load chain. Operate the hoist in the up direction to verify that the Load Limiter actuates and prevents the
hoist from lifting the load. Readjust if necessary.

Advertising