J. vertical venting diagrams – HTP 850 LPHL User Manual

Page 33

Advertising
background image

33

LP- 205 REV. 3.28.14

J. VERTICAL VENTING DIAGRAMS

Figure 17

– Two Pipe Roof Venting with Tee and Coupling

All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of ¼” per foot back to the boiler to allow
drainage of condensate. Exhaust connection insertion depth should be

a minimum of 2 ½” for models 300/500 and 3” for 850. When

placing support brackets on vent piping, the first bracket must be within 1’ of the appliance and the balance at 4’ intervals on the vent
pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the boiler.

Advertising
This manual is related to the following products: