EMERGENCY COMBINATION SYSTEM

4

ECS-6216P/S

Equipment Setting and Checking

Equipment Setting and Checking

1. Address Setting

1) Entire system uses only one ECS-6216P; if expansion is needed, additional ECS-6216S units must be

added.

2) The equipment numbers for each wiring condition is set by the rear panel DIP switch.

Caution: ECS-6216P should be setting as No. 1.

3) The table below shows the setting methods; the ON switch setting/number will be the equipment number.

Caution: If an equipment number is not set, all zone indicator LEDs will be blink. If the number is

already in-use, communication will be impossible. In case of above cases, please check the
equipment number set-up status.

4) Zone allocation is as follows.

.
2. TERMINATION Switch (LOAD/OPEN) Setting

1) For the system linked by using RS-485 communication interface, it is necessary to set the termination

switch (LOAD/OPEN) on the rear panel to stabilize data transfer.

2) Set the termination switch to LOAD only for the first and last-numbered equipment units. All others must be

set to OPEN.

Caution: Communication error may occur if setting is performed incorrectly.

DIP Switch

1

2

3

4

5

6

7

8

9

10

1
2

Equipment

3

No.

10

ECS-

6216P

ECS-

6216S

ECS-

6216S

ECS-

6216S

Equipment No.

1

2

3

4

5

6

7

8

9

10

ZONE Allocation

1~16

17~32 33~48 49~64 65~80 81~96 97~112 113~128 129~144 145~160

Equipment 1

S/W: LOAD

IN

OUT

Equipment 2

S/W: OPEN

IN

OUT

Equipment 3

S/W: OPEN

IN

OUT

Equipment N

S/W: LOAD

IN

OUT