Quick reference guide, Operation and testing – IPA Tools 9007A Smart MUTT Head User Manual

Page 7

Advertising
background image

7

ELECTRICAL TESTING
1. CABLE TESTING: It is always recommended to use the cable tester to verify that

the MUTT

®

’s 7 round pin cable used is in proper working order

before trailer testing. To perform Cable Test insert both ends of the 7 pin

cable one in each receptacle on the MUTT’s side. Once the cable is installed, turn

the MUTT

®

ON to verify the continuity between both ends of the cable. Look for the

solid green light verifying Ground Integrity and note if there are any green circuit

LEDs blinking. Note that each circuit is tested upon start up as well as ground fault

check. Solid LEDs mean Good connection, Blinking LEDs indicate an open circuit

or poor continuity. The cable tester can also be used to inspect all trailer cables.

2. GROUND INTEGRITY: When the MUTT

®

is first turned on, Ground Integrity and

Open Circuit checks are being performed. The green lights around the Control

Knob will blink and disappear one at a time until only the Ground Integrity light

remains solid green. When all the lights blink, it indicates a poor cable connection

or bad ground. Individual blinking lights indicate an open circuit.

(Refer to pg. 11, #9)

3. CIRCUIT PROBLEM INDICATION: As you turn the MUTT

®

Control Knob to test

each circuit, a steady green light verifies a properly working circuit. Refer to the

three red LEDs to the left of the Control Knob for circuit problem indication. These

LEDs will blink and the MUTT

®

will sound if there is a problem.

4. LOW DRAW LED TRAILERS: The MUTT

®

will identify any circuit drawing less

than 100 mA as an open circuit. The trailer must have a minimum of two standard

LED Pods on each circuit. ABS circuits using ABS computers are typically within

the threshold and do not require additional load.

5. CIRCUIT SELECTION: Circuits can be selected by pressing the Control Knob

for “Auto Cycle Mode”, manually turning the Control Knob or by using the remote

control.

6. ALL CIRCUITS ON: All circuits can be turned on at one time by pressing/holding

the large remote button for 5 seconds. To cancel, press and release large button

on remote.

QUICK REFERENCE GUIDE

OPERATION AND TESTING

Advertising