Hardware installation, Installation steps, Nstallation – LevelOne IFE-0502 User Manual

Page 17: Teps

Advertising
background image

Hardware Installation


In this paragraph, we are going to mention how to install the 4-Port PoE + 1-Port SC
Industrial Fast Ethernet Switch and the installation points to be attended to it.

Installation Steps


1. Unpack the Industrial switch packing.
2. Check if the DIN-Rail is screwed on the Industrial switch or not. If the DIN-Rail is

not screwed on the Industrial switch, please refer to DIN-Rail Mounting section
for DIN-Rail installation. If user want to wall mount the Industrial switch, then
please refer to Wall Mount Plate Mounting section for wall mount plate
installation.

3. To hang the Industrial switch on the DIN-Rail track or wall, please refer to the

Mounting Installation section.

4. Power on the Industrial switch. Please refer to the Wiring the Power Inputs

section for knowing the information about how to wire the power. The power LED
on the Industrial switch will light up. Please refer to the LED Indicators section for
indication of LED lights.

5. Prepare the twisted-pair, straight through Category 5e/above cable for Ethernet

connection.

6. Insert one side of the RJ-45 cable into the Industrial switch Ethernet port and

another side to the network device’s Ethernet port, e.g. Switch, PC or Server. The
UTP/STP port (RJ-45) LED on the Industrial switch will light up when the cable is
connected with the network device. Please refer to the LED Indicators section for
LED light indication.

7. When all connections are set and LED lights all show in normal, the installation is

complete.







17

Advertising
This manual is related to the following products: