Installation instructions iq21x, 4replacing the battery – TREND IQ21x User Manual

Page 9

Advertising
background image

9

IQ21x Installation Instructions TG200059 Issue 1/E 09/11/06

Installation Instructions

IQ21x

15

Close Panel

13

Download Strategy

4

Replacing the Battery

(Continued)

16

Reconnect Input power to I/O, Network

O

I

SET

IQ21x

X.IQ2

SET Manual TE200147

OR

9 F'D'

RJ11

IQ21x

IQ21X

also set time, day, date

Reset RAM

12

Complete Zero Address/Baud
Rate Switch Reset (Section 5
below, steps 6 to 11).

If not IQ2v3
(IQ2v3 will reset RAM
automatically)

IQ21x/USA:

The unit is UL rated as 'UL916,
listed open energy
management equipment'

If fitted in ENCLS/MBOX/IQ21x

14

Close MBOX

a

b

Advertising