Link network connectors, Connect to lonworks, Check settings – TREND KIT_NODE_IQ25x User Manual

Page 6: Switch on, Check node controller

Advertising
background image

6

KIT/NODE/IQ25x Installation Instructions TG200595 Issue 1/B 21/11/06

KIT/NODE/IQ25x

Installation Instructions

2

INSTALLING A NODE IN IQ250/251 USING KIT/NODE/IQ25X

(Continued)

Link Network Connectors

24

If ANC, AND, XN28, MNC, TMN, is fitted and IQ25x is not networked (stand alone)

T -

T +

R -

R +

T -

T +

R -

R +

N E T W O R K

O U T

I N

A D D R E S S

O N

R X

T X

Connect to LonWorks

25

(a)

Knock out hole

(c)

Connect Lon cables

(b)

Route cables through hole

J 1 5

J 1

L A N

P

O

W

E

R

J 1 1

9

1

0

J 1 2

J 9

J 1 7

For LINC only

either pierce grommet

or use copex gland

Check Settings

26

(a) Check network baud rate.
(b) Check network address and dumb/normal switch.
(c) Check 2nd network/device baud rate.

Node
Controller
Data Sheet

Switch On

27

O

1

Check Node Controller

28

J7

ET

1

J1

6

D

ev

B

J1

5

D

ev

A

J9

J8

La

n B

La

n A

M

od

em

TMN type board shown
Check node data sheet for
location of LEDs on other
boards

b

W/DOG
(red)

a

PWR ON
(green)

Check input
power

Node Faulty

If appropriate

Advertising