Installation (for qualified installers only), Vent installation – Avalon Stoves 21 DV Fireplace User Manual

Page 16

Advertising
background image

16

Installation (for qualified installers only)

© Travis Industries

4040830

100-01143

Vent Installation

•

Slide the vent sections together and turn 1/4 turn until the sections lock
in place.

•

Screws are not required to secure the vent. However, three screws may
be used to secure vent sections together if desired.

•

High temperature sealant is recommended at the appliance starter
section connection (use high-temperature silicone or Mill-Pac®).

•

If disassembly is required, at time of re-assembly check to see if the vent
creates a tight fit. If it does not, apply high temperature sealant to the
joints of the affected sections.

•

Horizontal sections require a 1/4" rise every 12" of travel

•

Horizontal sections require non-combustible support every three feet (e.g.: plumbing tape)

•

In addition to the requirements below, follow the requirements provided with the vent.

Vertical Termination

(use the "High Wind Terminatin"

Use a roof flashing and

storm collar whenever

passing through the roof

Vertical Vent

Requirements

0" Clearance on vertical

Sections to combustible

surfaces (after the first

firestop).

Use a ceiling firestop whenever

passing through a ceiling (or

enclosure and at every floor

penetration.

Combustible

Framing

Use a firestop when passing through a wall. Make

sure there is a 2" clearance above the vent.

2" Min.

1" Min.

0" Clearance

Combustible

Surfaces

Horizontal Vent

Requirements

Advertising