Installation (for qualified installers only), Termination requirements – Avalon Stoves 21 DV Fireplace User Manual

Page 20

Advertising
background image

20

Installation (for qualified installers only)

© Travis Industries

4040830

100-01143

Termination Requirements

NOTE: Measure all clearances from the nearest edge of the exhaust hood.

A

Minimum 9" clearance from any door or window

B

Minimum 12" above any grade, veranda, porch, deck or balcony

C

Minimum 3-3/8" from outside corner walls

D

Minimum 0" from inside corner walls

E

Minimum 11" clearance below unventilated soffits or roof surfaces

Minimum 18" clearance below ventilated soffits
Minimum 6" clearance from roof eaves
NOTE: Vinyl surfaces require 24"

11” Min.

6” Min.

Roof
Surface

Roof
Eaves

F

Minimum 18" clearance below a veranda, porch, deck or balcony (must have two open
sides)

G

Minimum 48" clearance from any adjacent building

H

Minimum 84" clearance above any grade when adjacent to public walkways or driveways
NOTE: may not be used over a walkway or driveway shared by an adjacent building

I

Minimum 48" clearance from any mechanical air supply inlet

J

Minimum 36" clearance above and 48” below and to the sides of non-mechanical air
supply inlet

K

Minimum 36" from the area above the meter/regulator (vent outlet)

L

Minimum 36" from the meter/regulator (vent outlet)

M

Minimum 12” above the roof line (for vertical terminations)

N

Minimum 24” horizontal clearance to any surface (such as an exterior wall) – for vertical
terminations

C

B

H

E

G

A

D

F

L

K

J

I

NOTE: Measure clearances to the nearest edge of the exhaust hood.

A

E

E

M

N

•

Use the vinyl siding standoff (#950) when installing on an exterior with vinyl siding.

•

Vent termination must not be located where it will become plugged by snow or other material.

•

Venting termination shall not be recessed into a wall or siding.

•

These clearances meet UMC-1994 code standards.