Vanguard VBT-60_80 User Manual
Page 17

VBT-60/80 Operating Procedures
17
6.1.2. Repeat Test Procedure
The following steps shall be used to repeat a test.
Table 6. Repeat Test Procedure
STEP
DESCRIPTION
DISPLAY
ACTION
1
Initiate a test
MAIN: <RUN TEST>
20:02:00
Press knob
2
Confirm current
setting
“PRESS” IF OKAY
60KV 10Sec 300uA
Press knob
3
Start Test Now
PRESS RED SWITCH
TO START TEST
Press and hold RED
Switch
4
Test in progress
60.0KV 0.20uA
Time: 00.04
Press and hold RED
Switch
5
Observe PASS/FAIL
60KV 10Sec 300uA
>>PASS<<
Release RED Switch
6
Return to Main Menu
60KV 10Sec 300uA
>>PASS<<
Press knob
Note:
1. To change the Test Voltage, Test duration, or Over current setting, use SET UP menu.
2. A “FAIL” message will be displayed on the LCD and “TEST FAIL” indicator will be
illuminated on the front panel.
3. The VBT’s LCD displays “PASS” message along with the test voltage and test duration if a
test is successful.