Vestil FLP series User Manual

Owner's manual, Stainless steel flagpoles model fpl

Advertising
background image

VESTIL MANUFACTURING CORPORATION

2999 North Wayne St., Angola, IN 46703

Ph: 260-665-7586 • Fax: 260-665-1339

E-mail: [email protected] • www.vestil.com

INSTALLATION INSTRUCTIONS

1. A concrete pad will need to be poured for

installation. Use 3000 psi minimum strength
concrete. The size of the pad will need to be 30"
x 30" x 42" depth. The top surface must be level
in order for the flagpole to be plumb once
installed.

2. Allow concrete to set up for at least 24 hours.

3. Once concrete has fully set, center the base

plate on the concrete pad and mark out all holes
onto the concrete. Remove the base plate and
using a concrete hammer drill equipped with a 3/
4" diameter masonry drill bit, drill all holes out to
a depth of 7".

4. After all holes are drilled, place base plate back

on the concrete pad. With the base plate sitting
level on the pad, check for plumb of the pole.
Shimming maybe required at this point to bring
pole plumb.

5. Insert 3/4" sleeve anchor concrete bolts x 6"

length into each hole in the base plate, tapping
the bolts into place maybe required to set the
bolts in the full depth. Tighten the bolts in a
crosswise pattern to insure the plate stays level
on the pad.

Revised 10-02

STAINLESS STEEL FLAGPOLES

MODEL FPL

OWNER'S MANUAL

Advertising