Plunger pumps, Sj & xj series pumps, North america – Vortexx SJ & XJ Series User Manual

Page 6

Advertising
background image

Operating Instructions and Parts Manual

SJ & XJ Series Pumps

Plunger Pumps

First Choice When Quality Matters

NORTH

AMERICA

Figure 5

Figure 6

Special Features (continued)

Oil Seals and O-rings: All are
constructed of Buna-N rubber. The oil
seals have stainless steel garder springs
to assure constant tension on the
sealing surface.
Oil Capacity: 4.5 oz.

Extra Features

Dyno Proven: All pumps are dyno
tested to assure the theoretical design
meets the actual design.
Valve Design: Each pump series has a
valve design that optimizes its highest
efficiency.
Wet End Repair: Very simple no
special tools required.
Mounting Flanges: Gasoline SAE
J609a flange. Refer to breakdown.
Design: Using advanced fluid handling
design programs. Overall pump
efficiency is increased.

Installation

1. Install the shaft key into the keyway

and apply a light coating of anti-
seize on the engine shaft and key.

2. Align the two key ways and push

the pump completely onto the
engine.

3. Install all

four (4) bolts
and tighten
evenly. (See
figure 4)

4. Remove the

red shipping

oil cap and
install the black
crankcase vent
cap. (See figure 5)

5. Install the

appropriate water inlet and
discharge fittings.

6. Connect the water supply hose and

high-pressure discharge hose/spray
gun.

7. Turn on the water supply.
8. Open the spray gun to purge the

system of any air.

9. Start the engine.
10. If necessary adjust the engine speed

and unloader valve.

Unloader Adjustment Steps

Please follow these easy steps to adjust
the pressure:
Step 1: Remove black cap

(See figure 6 ref. no.
46)

Step 2: Loosen nut (See

figure 6 ref. no. 3)
with 10mm wrench.

Step 3: Turn brass (See

figure 6 ref. no. 4)
clockwise until it
stops.

Step 4: Install a liquid filled

pressure gauge in the
discharge line. The gauge
should be placed between the
unloader discharge fitting and
high-pressure hose.

Figure 4

Advertising