4 inspection of wiring – WARN PullzAll SERVICE GUIDE 685005, 685006 & 685007 User Manual
Page 41
Advertising
986767A2.doc
Page 41 of 45
7. Install leads to Rocker Switch
2.10.4 INSPECTION OF WIRING
VISUAL INSPECTION
• While disconnecting the connectors, never pull the Wiring Harnesses. Unlock the
connector first and then pull them apart by holding Connectors themselves.
• While connecting Connectors, also hold Connectors and put them together until they lock
securely (a click is heard).
• While Installing the Wiring Harness, fix it with clamps so that no slack is left.
• While using a tester for checking continuity or measuring voltage, be sure to insert the
tester probe from the Wire harness side.
Advertising